Asset report

Cilegon steel plant

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The POSCO PT Krakatau JV was established in August 2010 with the aim of building an integrated steel plant next to PT Krakatau s existing Cilegon steel plant. Construction of the plant began on July 26th 2011. The new Cilegon Banten plant began production on schedule on 23rd December 2013 and has the capacity to produce 3.2 Mtpa of crude steel 3.0 Mtpa of slab and 1.5 Mtpa of plate.

What's included

This report contains

  • Document

    Cilegon steel plant

    PDF 323.04 KB

  • Document

    Cilegon.xls

    XLS 329.00 KB

Table of contents

Tables and charts

This report includes 12 images and tables including:

Images

  • Detailed map
  • Finished steel production
  • Total operating cash costs: Finished steel

Tables

  • Key facts: Table 1
  • Economic assumptions: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Raw materials: Table 1
  • Products: Table 1
  • Production table (Mt)
  • Capital costs
  • Operating cash cost table

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898