Asset report

Constellation gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The accompanying analysis is based on the results of the preliminary economic assessment (PEA) released by the company in April 2016. This PEA assumes a conventional open pit operation for the Jose Maria deposit located in Argentina and a block caving underground mine for the Los Helados deposit located in Chile and a 150kt/d ore concentrator located in Argentina to produce a relative clean copper concentrate with an average grade of 29%Cu, 10.4g/t Au and 70g/t Ag. No moly production is expected.

What's included

This report contains

  • Document

    Constellation gold mine project

    XLS 131.00 KB

  • Document

    Constellation gold mine project

    PDF 4.04 MB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898