Asset report

Copper Cliff copper smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The smelter was commissioned in 1930 as a copper/nickel smelter and many process schemes have been used since that time. Initially the smelting of copper concentrates was undertaken in reverberatory furnaces but in 1952 the use of the Inco flash furnace was introduced and it was ultimately the only furnace used for copper concentrates. Since 1948 the nickel smelter has been separating Cu and Ni by slowly cooling matte followed by crushing grinding and flotation of Cu2S and Ni3S2...

What's included

This report contains

  • Document

    Copper Cliff copper smelter

    PDF 592.07 KB

  • Document

    Copper Cliff copper smelter.xls

    XLS 477.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Projects
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Costs: Image 1
  • Products: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Products: Table 1
  • Products allocation

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898