Asset report

Corunna Downs iron ore mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Atlas Iron has approved the Corunna Downs project. Production from Corunna Downs will replace tonnages from the depleting Wodgina and Abydos mines which will cease production in the first and second half of 2017 respectively.Construction will take place through 2017 with first ore on ship targeted for the March quarter of 2018. It should ramp up to full capacity of 4 Mtpa by early 2019. Forecast capital expenditure is A$47 A$53 million and will be funded from operating cashflow. Mining processing and haulage will be undertaken by a contractor.

What's included

This report contains

  • Document

    Corunna Downs.xls

    XLS 203.50 KB

  • Document

    Corunna Downs iron ore mine

    PDF 459.35 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
  • Operations
  • Infrastructure
  • Costs
  • Sales contracts
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Location maps: Image 1
  • Production
  • Cash Costs

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Marketable reserves (01/01/2017)
  • Production
  • Operations
  • Infrastructure
  • Cash Costs
  • Capital Costs
  • Product quality
  • Economic assumptions

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898