Asset report

Dongmau EAF nickel operation

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Located in Lianyungang City Jiangsu. Construction commenced in September 2009 with commissioning planned for H2 2010. Design capacity is 1Mt/a of NPI (ca. 30kt Ni/a) with a total capital investment of RMB 650M.

What's included

This report contains

  • Document

    Dongmau EAF nickel operation

    XLS 267.50 KB

  • Document

    Dongmau EAF nickel operation

    PDF 613.94 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898