Asset Report

Dugald River zinc mine project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Dugald River is a polymetallic project located in the established mining region around Mt Isa and adjacent to the proposed Roseby Copper Project.  It is the most advanced project in the portfolio of MMG. An updated development plan for Dugald River was announced by MMG in 2015 which included a mined production target of 1.5Mt over 25 years, with first production expected in H1 2018.

What's included

This report contains

  • Document

    Dugald River zinc mine project

    PDF 756.01 KB

  • Document

    Dugald River zinc mine project.xls

    XLS 694.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
  • Infrastructure
    • Operating costs
    • CAPEX
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 12 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Economic assumptions: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Operations: Table 1

Images

  • Detailed map
  • Production: Image 1
  • Costs: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800