Asset Report

Dugald River zinc mine project

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

04 September 2018

Dugald River zinc mine project

Report summary

Dugald River is a polymetallic project located in the established mining region around Mt Isa. An updated development plan for Dugald River was announced by MMG in 2015 which included a mined production target of 1.5Mt over 25 years. After various setback and delays first production started in November 2017 with commissioning and ramp-up following during 2018.

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
    • Mining
    • Processing
      • Operating profile
  • Infrastructure
    • Operating costs
    • CAPEX
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 12 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Image 1
  • Economic assumptions: Table 1
  • Costs: Table 1
  • Costs: Image 1
  • Costs: Table 2
  • Operations: Table 1

What's included

This report contains:

  • Document

    Dugald River zinc mine project.xls

    XLS 669.50 KB

  • Document

    Dugald River zinc mine

    PDF 1.18 MB

Other reports you may be interested in

Browse reports by Industry Sector