Asset report

Eagle Gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Eagle Gold project is located within the Dublin Gulch property in the Mayo mining district. Eagle Gold is planned as an open pit mining operation using conventional truck and shovel methods. Ore will undergo three stage crushing before being heap leached. The project is expected to start in 2017 with gold production estimated at around 200 thousand ounces per annum over a 10 year mine life..

What's included

This report contains

  • Document

    EgpAu.xls

    XLS 124.00 KB

  • Document

    Eagle Gold mine project

    PDF 871.95 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898