Asset report

Eastern Dragon gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Eastern Dragon gold mine project is located 45km southeast of the town of Xunke which is adjacent to the Heilongjiang River which forms the border with Russia. Gold ore will be mined initially via open pit method and subsequently via underground mining underneath the open pit. Production is expected to commence in Q1 2017. Once in full production Eastern Dragon is expected to produce 70koz of gold annually.

What's included

This report contains

  • Document

    Eastern Dragon gold mine project

    XLS 121.00 KB

  • Document

    Eastern Dragon gold mine project

    PDF 795.01 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Philex gold mine

Asset report

Didipio gold mine

Asset report

Tembang gold mine

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898