Asset Report
Eleonore gold mine (1)
Report summary
The Gaisky GOK mine and mill complex is located 280km east of Orenburg near the northeastern border of Kazakhstan. Gaisky is the largest source of ore for the UGMK subsidiary Ural Mining Metallurgical Company (UMMC). UGMK is a vertically integrated metals producer which contributes roughly 40% of Russia's total copper cathode production. Operations comprise an underground mine, two open pit mines named Letneye and Osennee and a mill producing copper, zinc and pyrite concentrates. However,...
Table of contents
- Summary
- Key issues
-
Mining
- Underground (1960 - Present)
- Open-Pit (1962-Present)
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
03 June 2020
Eleonore gold mine
Asset Report
Eleonore gold mine
A detailed analysis of the Eleonore gold mine project.
$2,25021 December 2015
Similco (Closed) gold mine
Asset Report
Similco (Closed) gold mine
A detailed analysis of the Similco (Closed) gold mine.
$2,25009 February 2021
Gold Ridge Restart (Closed) gold mine
Asset Report
Gold Ridge Restart (Closed) gold mine
A detailed analysis of the Gold Ridge Restart gold mine.
$2,250