Asset Report

Flin Flon copper smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Flin Flon copper smelter

Report summary

The Flin Flon copper smelter was commissioned in 1930 to treat concentrate from the Flin Flon mine.  At commissioning the smelter operated three roasters, a coal fired reverberatory furnace, two Peirce-Smith converters and a casting wheel for 180kg blister cakes.  A fourth roaster was added in 1936 and a third converter was added in 1940. In 1951, a drying plant to enable the treatment of leach residue from the on-site zinc smelter and a slag fuming plant to recover zinc from reverberatory...

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Flowsheet
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Flin Flon copper smelter.xls

    XLS 378.00 KB

  • Document

    Flin Flon copper smelter

    PDF 1.02 MB

Other reports you may be interested in

Browse reports by Industry Sector