Asset report

Flin Flon copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Flin Flon copper smelter was commissioned in 1930 to treat concentrate from the Flin Flon mine. At commissioning the smelter operated three roasters a coal fired reverberatory furnace two Peirce Smith converters and a casting wheel for 180kg blister cakes. A fourth roaster was added in 1936 and a third converter was added in 1940. In 1951 a drying plant to enable the treatment of leach residue from the on site zinc smelter and a slag fuming plant to recover zinc from reverberatory...

What's included

This report contains

  • Document

    Flin Flon copper smelter.xls

    XLS 444.00 KB

  • Document

    Flin Flon copper smelter

    PDF 585.02 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Images

  • Detailed map
  • Flowsheet

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898