Asset Report

Fos-sur-Mer steel plant

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Fos-sur-Mer is ArcelorMittal’s second largest steel plant in France. The plant is a part of ArcelorMittal’s Mediterranee unit. The plant is located in the south of France on the Mediterranean and consists of two blast furnaces, a coke plant, a sinter plant, two BOFs, two continuous casters and a hot strip mill. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
    • Steel plant overview
  • Iron ore
  • Coal
  • Coke
  • Metallics
  • Energy
  • Capital costs
  • Operating cash costs

Tables and charts

This report includes 10 images and tables including:

  • Detailed map
  • Participation
  • Downstream products
  • Finished steel production
  • Production table (Mt)
  • Capital costs
  • Total operating cash costs - Finished steel
  • Key raw materials rates

What's included

This report contains:

  • Document

    Fos-sur-Mer.xls

    XLS 316.50 KB

  • Document

    Fos-sur-Mer steel plant

    PDF 826.88 KB

  • Document

    Fos-sur-Mer steel plant

    ZIP 863.67 KB