Asset report

Gaspe copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The smelter was commissioned in December 1955 to treat concentrates from the Gaspé mine. At commissioning the smelter operated a single green charge reverberatory furnace, two Peirce-Smith converters and a stationary anode furnace. In the early 1970s a fluid bed roaster was added and the reverberatory furnace converted to calcine charging. A 920t/d acid plant treating roaster and converter gas was added in 1973, and during this period the fixed anode furnace was replaced with a rotating...

What's included

This report contains

  • Document

    Gaspe copper smelter

    PDF 485.33 KB

  • Document

    Gaspe copper smelter.xls

    XLS 446.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Feed preparation
    • Smelting process
    • Auxiliary plants

Tables and charts

This report includes 7 images and tables including:

Images

  • Detailed map
  • Flowsheet

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3

You may be interested in

    
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898