Asset report

Gaspe copper smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The smelter was commissioned in December 1955 to treat concentrates from the Gaspé mine. At commissioning the smelter operated a single green charge reverberatory furnace two Peirce Smith converters and a stationary anode furnace. In the early 1970s a fluid bed roaster was added and the reverberatory furnace converted to calcine charging. A 920t/d acid plant treating roaster and converter gas was added in 1973 and during this period the fixed anode furnace was replaced with a rotating...

What's included

This report contains

  • Document

    Gaspe copper smelter

    PDF 486.16 KB

  • Document

    Gaspe copper smelter.xls

    XLS 446.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview

Tables and charts

This report includes 7 images and tables including:

Images

  • Detailed map
  • Flowsheet

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3

You may be interested in?

    
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898