Asset Report

Gross gold mine project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Gross project is planned as an an open pit, heap leach operation with average annual gold production of 220koz over a 17 year mine life. The property is located 125km northeast of the Ikabya station on the BAM railway and 4km east of Nordgold's Neryungri gold mine. Access to the property by road is via all-weather roads. Power supply from an on-site coal power plant is planned.

What's included

This report contains

  • Document

    Gross gold mine project

    PDF 803.06 KB

  • Document

    Gross gold mine project

    XLS 127.00 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800