Asset report

Gross gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Gross project is planned as an an open pit heap leach operation with average annual gold production of 220koz over a 17 year mine life. The property is located 125km northeast of the Ikabya station on the BAM railway and 4km east of Nordgold's Neryungri gold mine. Access to the property by road is via all weather roads. Power supply from an on site coal power plant is planned.

What's included

This report contains

  • Document

    Gross gold mine project

    PDF 802.74 KB

  • Document

    Gross gold mine project

    XLS 127.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Production
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898