Asset report

Gurupi gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Gurupi project is planned as an open pit operation utilising conventional truck and excavator open pit mining methods. Mine life is estimated at 13 years with average ore production of 5 Mt/a. The Gurupi 15 00kt/d mill is expected to comprise a carbon in pulp (CIP) leach circuit with an ADR (Adsorption Desorption and Recovery) plant. Avanco Resources signed a deal to acquire potentially up to 100% of the project subject to work and production parameters being achieved.

What's included

This report contains

  • Document

    Gurupi Project gold mine

    XLS 124.50 KB

  • Document

    Gurupi gold mine project

    PDF 607.41 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 4 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898