Asset report

Hamersley - Paraburdoo iron ore mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Paraburdoo is part of Rio Tinto's wholly owned Hamersley group of operations located 58 kilometres west of Tom Price. Paraburdoo Channar and Eastern Range are collectively known as the Greater Paraburdoo Operations (GPO). Paraburdoo's capacity has been expanded from 2.5Mtpa to 8Mtpa as part of Rio Tinto's 360Mtpa expansion. It is one of Rio Tinto's highest cost Australian iron ore mines owing to its high strip ratio and complex fines processing.

What's included

This report contains

  • Document

    Hamersley - Paraburdoo.xls

    XLS 208.00 KB

  • Document

    Hamersley - Paraburdoo iron ore mine

    PDF 460.17 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
  • Operations
  • Infrastructure
  • Costs
  • Sales contracts
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Production
  • Operations
  • Infrastructure
  • Product quality
  • Economic assumptions
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Costs: Table 1
  • Costs: Table 2

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898