Asset Report
Hayden copper smelter
Report summary
The Hayden Smelter was commissioned with two conventional oil fired reverberatory furnaces in 1912 to treat concentrates from the Ray mine. The Inco flash furnace together with a new acid plant was commissioned in November 1983 at a cost of US$133M. Early problems with dust plugging of the gas handling system, failure of sections of the sprung arch roof and erosion of sidewall refractories led to major rebuilds in December 1984, February 1986, April 1987 and March 1989. Modifications to...
Table of contents
- Flowsheet
- Feed preparation
- Smelting process
- Auxiliary plants
- Environmental
Tables and charts
This report includes 4 images and tables including:
What's included
This report contains:
Other reports you may be interested in
18 November 2022
Chambishi (NFC) copper smelter
Asset Report
Chambishi (NFC) copper smelter
A detailed analysis of the Chambishi (NFC) copper smelter.
$2,25026 May 2023
Amarillo copper refinery
Asset Report
Amarillo copper refinery
A detailed analysis of the Amarillo copper refinery.
$2,25031 August 2022
Heding copper smelter
Asset Report
Heding copper smelter
Heding copper completed its expansion in 2017 and its capacity reached 350 ktpa.
$2,250