Asset report

Hounde gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The project comprises the Vindaloo and Madras NW zones and two new deposits (Bouere and Dohoun) within 14km of the proposed mill site. The deposits will be mined by open pit methods over a 10 year mine life with average annual gold production of 190koz (248koz/a in first 2 years).Production is expected to commence by late 2017 following a US$328 capital investment.

What's included

This report contains

  • Document

    Hounde gold mine project

    PDF 620.42 KB

  • Document

    Hounde gold project mine.xls

    XLS 113.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Infrastructure
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898