Asset Report

Hurley copper smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The smelter was commissioned in 1939 with one green feed reverberatory furnace and two 4.0m x 9.1m Peirce-Smith converters, with production cast as blister sows.  A third converter was added in 1941 and a reverberatory fire-refining furnace was installed in 1942.  A fourth converter was installed in 1971 followed by a double contact acid plant to treat converter gases in 1974. The reverberatory furnace was replaced by an Inco flash furnace together with an associated 410t/d oxygen plant in...

What's included

This report contains

  • Document

    Hurley copper smelter

    PDF 477.92 KB

  • Document

    Hurley copper smelter.xls

    XLS 444.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Flowsheet

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898