Asset report

Hurley copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The smelter was commissioned in 1939 with one green feed reverberatory furnace and two 4.0m x 9.1m Peirce Smith converters with production cast as blister sows. A third converter was added in 1941 and a reverberatory fire refining furnace was installed in 1942. A fourth converter was installed in 1971 followed by a double contact acid plant to treat converter gases in 1974. The reverberatory furnace was replaced by an Inco flash furnace together with an associated 410t/d oxygen plant in...

What's included

This report contains

  • Document

    Hurley copper smelter

    PDF 478.74 KB

  • Document

    Hurley copper smelter.xls

    XLS 444.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Images

  • Detailed map
  • Flowsheet

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898