Hurley copper smelter
Loading current market price
Report summary
The smelter was commissioned in 1939 with one green feed reverberatory furnace and two 4.0m x 9.1m Peirce-Smith converters, with production cast as blister sows. A third converter was added in 1941 and a reverberatory fire-refining furnace was installed in 1942. A fourth converter was installed in 1971 followed by a double contact acid plant to treat converter gases in 1974. The reverberatory furnace was replaced by an Inco flash furnace together with an associated 410t/d oxygen plant in...
What's included
This report contains
Table of contents
- Key facts
- Summary and key issues
- Location maps
- Participation
-
Process overview
- Environmental
- Economic assumptions
Tables and charts
This report includes 8 images and tables including:
Images
- Detailed map
- Flowsheet
Tables
- Key facts: Table 1
- Participation: Table 1
- Process overview: Table 1
- Process overview: Table 2
- Process overview: Table 3
- Economic assumptions: Table 1
You may be interested in
Alouette aluminium smelter
Bingham Canyon gold mine
North Bullfrog gold mine project
Questions about this report?
-
Europe:+44 131 243 4699
-
Americas:+1 713 470 1900
-
Asia Pacific:+61 2 8224 8898