Asset report

Hurley copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The smelter was commissioned in 1939 with one green feed reverberatory furnace and two 4.0m x 9.1m Peirce-Smith converters, with production cast as blister sows. A third converter was added in 1941 and a reverberatory fire-refining furnace was installed in 1942. A fourth converter was installed in 1971 followed by a double contact acid plant to treat converter gases in 1974. The reverberatory furnace was replaced by an Inco flash furnace together with an associated 410t/d oxygen plant in...

What's included

This report contains

  • Document

    Hurley copper smelter

    PDF 477.93 KB

  • Document

    Hurley copper smelter.xls

    XLS 444.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Images

  • Detailed map
  • Flowsheet

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898