Asset report

Iduapriem (including Teberebie from 2001) gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Iduapriem is a Anglogold Ashanti`s remaining operating asset in Ghana. In 2016 the operation produced 214koz of gold. This was up from the 192koz produced in 2015. The improvement was due to the mining and processing of higher grade material and increased plant throughput. The plant is being modified in 2017 to improve recoveries. To extend the mine life a major waste stripping programme started in 2016.

What's included

This report contains

  • Document

    Iduapriem (including Teberebie from 2001) gold mine

    XLS 143.50 KB

  • Document

    Iduapriem (including Teberebie from 2001) gold mine

    PDF 463.79 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898