Asset report

Jabal Sayid copper mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Jabal Sayid is located approximately 50km north east of the existing Mahd Adh Dhahab gold mine. First concentrate shipment was announced in December 2015 with 12Mlbs of copper concentrate produced during commissioning and commercial production was declared in July 2016 with 60Mlbs of copper concentrate produced. Average annual production of 100Mlbs copper concentrate is expected as the mine ramps up to full production.

What's included

This report contains

  • Document

    Jabal Sayid copper mine project

    XLS 503.00 KB

  • Document

    Jabal Sayid copper mine project

    PDF 979.29 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Production
  • Operations
  • Sales contracts
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898