The operation consists of five underground mines: Canavieiras, Joao Belo, Morro do Cuscuz, Morro do Vento and Serra do Corrego. The processing plant utilizes a standard crush and grind, with Carbon-in-Pulp (CIP), gravity and leaching circuits to produce gold doré bars. In 2019, Yamana began optimizing the processing plant to stabilize throughput at a 6,500tpd (Phase 1). This was achieved in June 2020, with the throughput exceeding the stated target by reaching 6,800tpd. The operation expects the throughput to increase in phases - Phase 2 reaching 8,500tpd, Phase 3 reaching 10,000tpd and Phase 4 reaching 15,000tpd.
Table of contents
- Summary
- Key issues
-
Emission
- Mining
- Processing
Tables and charts
This report includes 2 images and tables including:
- Jacobina Emission Intensity Quartile ranking – total global production - tonnes Au equivalent