Asset report

Jaguarari copper mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Jaguarari operates an underground and an open pit mine and a 20kt/d concentrator. The latter operates well below its nominal capacity due to lack of ore. In 2014 the concentrator was operating at a rate of 8kt/d ore and for 2015 it is expected a milling rate of 7.5kt/d. Until 2013 Jaguarari also operated a SxEw plant of 5kt/a cathode. No production from this plant was reported for 2014. In January 2016 the Ug mine suffered rain flooding and by June 2016 operations were stopped due to economic reasons.

What's included

This report contains

  • Document

    Jaguarari copper mine

    XLS 560.00 KB

  • Document

    Jaguarari copper mine

    PDF 828.39 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Costs
  • Production
  • Operations
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898