Asset report

Jerooy  gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Jerooy is anticipated to be an open pit operation utilising conventional mining methods o ver a 10 year mine life. Ore will be processed in a 1.2Mt/a capacity plant comprising a CIP circuit. In May 2015 a tender to develop the mine was awarded to Vostok Geoldobycha in a bid worth US$100 million and a commitment to take on legal costs associated with previous investors.

What's included

This report contains

  • Document

    Jerooy Project gold mine

    XLS 123.50 KB

  • Document

    Jerooy gold mine project

    PDF 1.00 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898