Asset Report
Khandiza zinc mine
Report summary
Commercial production was declared to have been achieved in 2012. The project operator, Almalyk Metallurgical Kombinat (AGMK) acquired the mine from the previous owners Marakand Minerals following a presidential decree in 2006. The mine was commissioned in 2010 at a capital cost of $147M. Capacity of the mill is 650kt/a ore. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Emissions
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Khandiza Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Pine Point zinc mine project
A detailed analysis of the Pine Point zinc mine project.
$2,250
Asset Report
Khandiza copper mine
A detailed analysis of the Khandiza copper mine.
$2,250
Asset Report
Zinkgruvan (Ammeberg) zinc mine
A detailed analysis of the Zinkgruvan (Ammeberg) zinc mine.
$2,250