Asset Report

Kidd Creek copper smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The smelter was commissioned in 1981 with a nominal capacity of 59kt/a copper and at a cost of US$240M, including the refinery.  The potential for higher production by increased oxygen enrichment was demonstrated with purchased liquid oxygen.  Consequently, a second oxygen plant was installed in 1985 that, together with other modifications notably to the feed conveyor system, increased the plant capacity to 100kt/a.  The increased oxygen enrichment also allowed an increase in the acid plant...

What's included

This report contains

  • Document

    Kidd Creek copper smelter

    PDF 585.58 KB

  • Document

    Kidd Creek copper smelter.xls

    XLS 443.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Flowsheet

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898