Report summary

The smelter was commissioned in 1981 with a nominal capacity of 59kt/a copper and at a cost of US$240M including the refinery. The potential for higher production by increased oxygen enrichment was demonstrated with purchased liquid oxygen. Consequently a second oxygen plant was installed in 1985 that together with other modifications notably to the feed conveyor system increased the plant capacity to 100kt/a. The increased oxygen enrichment also allowed an increase in the acid plant...

What's included

This report contains

  • Document

    Kidd Creek copper smelter

    PDF 586.38 KB

  • Document

    Kidd Creek copper smelter.xls

    XLS 443.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Images

  • Detailed map
  • Flowsheet

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898