Asset report

Koka gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Koka project was planned as a conventional open pit operation with an 8 year mine life. The process plant comprises a gravity and carbon in leach (CIL) circuit with a maximum throughput capacity of 0.7Mt/a.Average annual gold production is estimated at 80 140koz/a.

What's included

This report contains

  • Document

    Koka Project gold mine

    XLS 119.50 KB

  • Document

    Koka gold mine

    PDF 771.49 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Asset report

Buzwagi gold mine

Asset report

Bulyanhulu gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898