Asset report

Koka gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Koka project was planned as a conventional open pit operation with an 8 year mine life. The process plant comprises a gravity and carbon in leach (CIL) circuit with a maximum throughput capacity of 0.7Mt/a.Average annual gold production is estimated at 80 140koz/a.

What's included

This report contains

  • Document

    Koka Project gold mine

    XLS 119.50 KB

  • Document

    Koka gold mine

    PDF 771.49 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898