Asset report

Kremnica (Sturec) gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Sturec will be an open pit operation utilising conventional mining methods. Low grade ore will be mined and stockpiled for treatment in the latter years of the mine life. The process plant will comprise conventional gravity and CIL cyanidation circuits with a 6kt/d design capacity.Gold production is estimated at around 65 thousand ounces per annum.

What's included

This report contains

  • Document

    Kremnica (Sturec) gold mine project

    XLS 125.00 KB

  • Document

    Kremnica (Sturec) gold mine project

    PDF 515.53 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898