Asset report

Kunming zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The original Kunming zinc smelter had a capacity of 10kt/a and was commissioned in 1985. Work was started in 2000 to expand the zinc smelter to a nominal 50kt/a capacity The expansion finally commissioned in 2002. At the end of 2008 a new 100kt/a acid plant was commissioned at the zinc smelter site to treat the off gases from the zinc smelter roasters.

What's included

This report contains

  • Document

    Kunming zinc smelter

    PDF 659.10 KB

  • Document

    Kunming zinc smelter.xls

    XLS 530.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 1
  • Products: Table 2
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898