Asset report

Soto Norte (La Bodega) gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Soto Norte project is planned as an underground mining operation utilising sub-level open stoping mining methods. A 12 year mine life is expected, producing 7.5kt/d of ore. The processing plant comprises flotation circuits for copper-gold-silver concentrate and gold extraction will be achieved through leaching in an adsorption-desorption-recovery (ADR) circuit. Gold production is estimated at around 250 thousand ounces per year.

What's included

This report contains

  • Document

    La Bodega Project gold mine

    XLS 127.00 KB

  • Document

    Soto Norte (La Bodega) gold mine project

    PDF 753.40 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898