Asset report

Soto Norte (La Bodega) gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Soto Norte project is planned as an underground mining operation utilising sub-level open stoping mining methods. A 12 year mine life is expected, producing 7.5kt/d of ore. The processing plant comprises flotation circuits for copper-gold-silver concentrate and gold extraction will be achieved through leaching in an adsorption-desorption-recovery (ADR) circuit. Gold production is estimated at around 250 thousand ounces per year.

What's included

This report contains

  • Document

    La Bodega Project gold mine

    XLS 127.00 KB

  • Document

    Soto Norte (La Bodega) gold mine project

    PDF 753.40 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898