Asset report

La Bodega gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The La Bodega project is planned as an underground mining operation utilising sub level open stoping mining methods. A 14 year mine life is expected producing 7.5kt/d of ore. The processing plant comprises flotation circuits for copper gold silver concentrate and gold extraction will be achieved through leaching in an adsorption desorption recovery (ADR) circuit. Gold production is estimated at around 300 thousand ounces per annum.

What's included

This report contains

  • Document

    La Bodega Project gold mine

    XLS 127.00 KB

  • Document

    La Bodega gold mine project

    PDF 752.90 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898