Asset Report

La Oroya copper smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The La Oroya copper smelter was commissioned in 1922 to treat ores and concentrates from surrounding mines.  The copper smelter forms part of a metallurgical complex that also includes lead and zinc smelters, copper and lead refineries, a precious metals refinery, and antimony, bismuth, indium and arsenic trioxide plants. At commissioning the smelter operated two silica sprung arch reverberatory furnaces.  In 1957 the width of the furnaces was increased and in 1965 a suspended basic roof was...

What's included

This report contains

  • Document

    La Oroya copper smelter

    PDF 609.96 KB

  • Document

    La Oroya copper smelter.xls

    XLS 442.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Flowsheet

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898