Asset Report

Lalor Lake gold mine

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

 Lalor Lake is an underground Zn-Cu mine in Canada, approximately 18km by road west of the town of Snow Lake, Maitoba. The two mining methods are predominantly used at Lalor; post pillar cut and fill mining and longhole open stope mining. It produces a copper concentrate and a zinc concentrate, both with gold and silver by-products. Lalor began ore production from the ventilation shaft in August 2012 and attained commercial production from the main shaft in the third quarter of 2014.

What's included

This report contains

  • Document

    Lalor Lake gold mine

    XLS 122.00 KB

  • Document

    Lalor Lake gold mine

    PDF 690.31 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Location maps: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800