Asset report

Lobo/ Marte gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Open pit mining is planned over a 12 year mine life with average annual gold production estimated at 310koz/a. In November 2014 Kinross withdrew the permit application for the project and all permitting was stopped. Future project development will require the re initiation of the permitting process.Given that Lobo Marte does not appear to be a priority development project for Kinross the accompanying analysis is speculative only and assumes an earliest possible start up date of 2022.

What's included

This report contains

  • Document

    Lobo/ Marte Project gold mine

    XLS 125.50 KB

  • Document

    Lobo/ Marte gold mine project

    PDF 485.46 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Tubarao steel plant

Asset report

Santa Cruz steel plant

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898