Asset report

Long Canyon gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Newmont is developing the operation in two phases. Phase 1 the subject of this analysis entails the construction of a conventional open pit mine with a heap leaching facility. Initial mine life is estimated at 8 years with average annual gold production of 100 150koz. Phase 1 capex is estimated at US$250 300 million but was completed under budget at US$247 million. Commercial production was declared in November 2016. The second phase entails the processing of the higher grade ore either at a plant to be constructed on site or via transportation to Newmont`s Gold Quarry mill.

What's included

This report contains

  • Document

    Long Canyon Project gold mine

    XLS 120.50 KB

  • Document

    Long Canyon gold mine project

    PDF 565.05 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898