Asset report

Mako gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Mako Gold Project is owned by Toro Gold Ltd. The company has taken the project through to the definitive feasibility stage which envisages an open pit mining operation where ore is processed through a conventional gravity and Carbon in leach (CIL) processing plant. The accompanying analysis assumes first production in 2018.

What's included

This report contains

  • Document

    Mako gold mine project

    XLS 121.50 KB

  • Document

    Mako gold mine project

    PDF 525.42 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898