Asset report

Marcona (Mina Justa) copper minesite project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The following notes and accompanying analysis consider a combined open pit SxEw and concentrator operation based on a definitive feasibility study (DFS) completed in June 2009. Oxide ore (12Mt/a) will be vat leached and processed to copper cathode using SxEw over an 11 year mine life and sulphide ore (5Mt/a) will be milled over a 10 year mine life. As at October 2013 the project was fully permitted and partially financed however work is still being carried out on a pre feasibility study.

What's included

This report contains

  • Document

    Marcona (Mina Justa) copper minesite project

    XLS 508.50 KB

  • Document

    Marcona (Mina Justa) copper minesite project

    PDF 520.95 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Production
  • Operations
  • Sales contracts
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898