Asset report

Marcona (Mina Justa) copper minesite project

This report is currently unavailable

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The following notes and accompanying analysis consider a combined open-pit SxEw and concentrator operation based on a definitive feasibility study (DFS) completed in June 2009. Oxide ore (12Mt/a) will be vat-leached and processed to copper cathode using SxEw over an 11-year mine life and sulphide ore (5Mt/a) will be milled over a 10-year mine life. As at October 2013, the project was fully permitted and partially financed however work is still being carried out on a pre-feasibility study.

What's included

This report contains

  • Document

    Marcona (Mina Justa) copper minesite project

    PDF 520.95 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898