Asset report

Massawa gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Open pit mining is planned with a life of mine (LOM) strip ratio (waste:ore) of 7:1. Randgold has recently completed a revised PEA for Massawa including the Sofia deposit. The accompanying analysis is based on this plan which envisages some 21.6Mt of ore being processed at an average grade of 3.97 g/t.

What's included

This report contains

  • Document

    Massawa gold mine project

    PDF 561.08 KB

  • Document

    Massawa gold mine project

    XLS 112.00 KB

Table of contents

Tables and charts

This report includes 12 images and tables including:

Images

  • Detailed map
  • Production
  • Cash costs

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production
  • Economic assumptions: Table 1
  • Operations: Table 1
  • Costs: Table 1
  • Costs: Table 2

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898