Asset Report

Massawa gold mine project

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

06 December 2018

Massawa gold mine project

Report summary

Open pit mining is planned with a life of mine (LOM) strip ratio (waste:ore) of 7:1. Randgold has recently completed a revised PEA for Massawa including the Sofia deposit. The accompanying analysis is based on this plan which envisages some 21.6Mt of ore being processed at an average grade of 3.97 g/t. 

Table of contents

Tables and charts

This report includes 12 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production
  • Production
  • Economic assumptions: Table 1
  • Operations: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Cash costs

What's included

This report contains:

  • Document

    Massawa gold mine project

    PDF 1017.50 KB

  • Document

    Massawa gold mine project

    XLS 112.00 KB