Asset report

Meliadine gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Meliadine project comprises 1 underground and 2 open pit deposits. Ore will be processed by crushing grinding and gravity separation with cyanide leaching in a carbon in leach (CIL) circuit. In 2016 an internal study was initiated to improve project economics and a phased project development option was selected. Ore is to be sourced from the underground mine under Phase 1 with mill capacity set at 3.75kt/d. In year 5 ore will be sourced from open pit and underground targets with mill capacity increased to 6kt/d (Phase 2).Mine life is estimated at 14 years with average annual gold production of 400koz/a (between years 2 14).

What's included

This report contains

  • Document

    Meliadine Gold Project gold mine

    XLS 125.50 KB

  • Document

    Meliadine gold mine project

    PDF 707.84 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898