Asset report

Minas de Rio Tinto Restart copper project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Applications for the final permit necessary before the commencement of operations were submitted in Q3 2014. Upon receipt of said permit operations are expected to commence in late 2015. The project is owned and operated by EMED in whom a subsidiary of Trafigura has an 18% stake. The Rio Tinto mine last operated in 2001 and the restart plan calls for a 14 year open pit mine. Life of mine strip ratio is 1.1:1 with a plant throughput of 9Mt/a and copper concentrate production of 37kt/a.

What's included

This report contains

  • Document

    Minas de Rio Tinto Restart copper mine (2)

    XLS 509.50 KB

  • Document

    Minas de Rio Tinto Restart copper mine project

    PDF 388.72 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Costs
  • Operations
  • Timeline

Tables and charts

This report includes 4 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898