Asset Report
Mirador copper mine project
Report summary
The Mirador project started in 2019 and was the first large scale open pit mining operation in Ecuador. The concentrator capacity is 60kt/d ore (two lines of 30kt/d ore). Construction of the project started on December 21st 2015 and the commissioning started in July 2019 with 30kt/d ore. By September 2021 the concentrator was being operated below its nominal capacity. This project is located in the Zamora Chinchipe province, the El Panqui canton. The copper concentrate is expected to be exported through the Guayaquil port located 370km away.
Table of contents
- Summary
- Key issues
- Emissions
- CAPEX
- Operating
- Mining
- Processing
- Royalties and taxes
- Permitting
- Community relations
- Environmental reclamation
Tables and charts
This report includes 2 images and tables including:
- Mirador Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Panantza copper mine project
A detailed production, commercial and competitive analysis of the Panantza copper mine project.
$2,250
Asset Report
Yellowhead copper mine project
A detailed analysis of the Yellowhead copper mine project.
$2,250
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250