Asset report

Moose River gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Moose River Project comprises the Touquoy and Beaver Dam deposits. Touquoy West is located 60km east northeast of Halifax Central Nova Scotia while Beaver Dam comprises 76 claims across approximately 569 hectares located 22km east of Touquoy.

What's included

This report contains

  • Document

    Moose River gold mine project

    XLS 122.50 KB

  • Document

    Moose River gold mine project

    PDF 573.69 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
    • Mining
    • The Moose River project is planned as an open pit mining operation with conventional drill, blast and haul mining methods. Life of mine (LOM) is estimated at 9 years with initial production from Touquoy and then from Beaver Dam once Touquoy pit reserves are exhausted in year 5. The life of mine (LOM) stripping ratio is estimated at 3.73:1.
    • Processing
  • Infrastructure
    • CAPEX
    • Based on the 2010 Definitive Feasibility study (DFS), total capital cost was estimated at C$$228 million, including C$123 million and C$81 million pre-production capital for Touquoy and Cochrane Hill respectively.
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898