Asset Report

Moose River gold mine project

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

12 June 2017

Moose River gold mine project

Report summary

The Moose River Project comprises the Touquoy and Beaver Dam deposits. Touquoy West is located 60km east-northeast of Halifax, Central Nova Scotia while Beaver Dam comprises 76 claims across approximately 569 hectares, located 22km east of Touquoy.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
    • Mining
    • The Moose River project is planned as an open pit mining operation with conventional drill, blast and haul mining methods. Life of mine (LOM) is estimated at 9 years with initial production from Touquoy and then from Beaver Dam once Touquoy pit reserves are exhausted in year 5. The life of mine (LOM) stripping ratio is estimated at 3.73:1.
    • Processing
  • Infrastructure
    • CAPEX
    • Based on the 2010 Definitive Feasibility study (DFS), total capital cost was estimated at C$$228 million, including C$123 million and C$81 million pre-production capital for Touquoy and Cochrane Hill respectively.
  • Timeline

Tables and charts

This report includes 2 images and tables including:

  • Key facts: Table 1
  • Detailed map

What's included

This report contains:

  • Document

    Moose River gold mine project

    XLS 122.50 KB

  • Document

    Moose River gold mine project

    PDF 573.69 KB

Other reports you may be interested in

Browse reports by Industry Sector