Asset Report
Mount Dimer (Closed) gold mine
Report summary
The mill was placed on care and maintenance in 1997. Rehabilitation was completed in 2000 and plant and facilities put up for auction. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Mining
- Process
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Kalgoorlie - Mt. Percy (Closed) gold mine
A detailed analysis of the Kalgoorlie - Mt. Percy (Closed) gold mine.
$2,250
Asset Report
Bronzewing (including Mount McClure from 2000) (Closed) gold mine
A detailed analysis of the Bronzewing (including Mount McClure from 2000) gold mine.
$2,250
Asset Report
Mount Muro Restart (Closed) gold mine
A detailed analysis of the Mount Muro Restart gold mine.
$2,250