Asset report

Natalka gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Natalka project is owned by Russian company Polyus Gold International and was being developed as a large scale open pit operation utilising conventional drill and blast truck and shovel mining methods. The proposed mine was to be the largest gold mine in Russia at 40Mtpa but is now being developed at 10Mtpa due to a reserve downgrade. Commercial production is expected in 2018 and should average approximately 450 koz gold per year.

What's included

This report contains

  • Document

    Natalka gold mine project

    XLS 117.50 KB

  • Document

    Natalka gold mine project

    PDF 874.63 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898