Asset report

Natougou gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Natougou is planned as a conventional open pit operation with a mine life of 8 years. The plant will have a capacity of 1.34Mt/a and comprise gravity and carbon in pulp (CIP) circuits. A positive Feasibility Study was published in March 2016. Construction commenced in December 2016 with first full production expected in 2019.

What's included

This report contains

  • Document

    Natougou gold mine project

    XLS 122.00 KB

  • Document

    Natougou gold mine project

    PDF 470.37 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed Map

Tables

  • Key facts: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898