Asset report

Nezhdaninskoye gold mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

With little information available the accompanying analysis is indicative purposes and isbased on Wood Mackenzie assumptions with operations forecast to begin in 2020.

What's included

This report contains

  • Document

    Nezdhaninskoye Project gold mine

    XLS 128.50 KB

  • Document

    Nezhdaninskoye gold mine project

    PDF 895.11 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Costs
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898